A request has been received from Airband Community Internet LTD for a temporary road closure to apply to a section of Wyfold Road, whilst essential excavation in verge to install Airband cable for 1300m, 4 poles to be injected and 800m aerial cable to be installed works are carried out.
A Temporary Traffic Regulation Order (TTRO) is being made to implement the temporary closure and will operate from 01 April 2021 up to and including 14 April 2021. This will operate between 09:30 and 15:30
(The maximum duration of a TTRO on a road is 18 months and on a footpath is 6 months, or until completion of the works, whichever is the earlier.)
A copy of the drawing showing the extent of the closure and also the alternative route for traffic is attached.
Further information regarding the works may be obtained by contacting Clare Keay on 01905 676121 or emailclare.keay@airband.co.uk
T8627/AC